The expansion and renovations project will create much-needed, “state-of-the-art,” interactive classroom space, break-out lobby, study space and faculty and administration offices, as well as improve life/safety systems, accessibility, sustainability and infrastructure.
In October 2008, the founder bought a property as a gift to his wife for her college graduation. The lot was more than one thousand square meters. Since hiswife took up education, they decided to put up a school with two-storey temporary building. The first day of operation was June 9, 2008 with 89 students, five eachers, two utility workers and one registrar with minimal facilities and equipment and five classrooms. However, in September of the same year, the owners built one permanent two-storey building with five classrooms, offices, canteen and faculty room, and on March 2009 another construction of two-storey building with three classrooms and another two-storey building for libraries and laboratories for computer,science, speech and TLE.